Two letters from the Department of the Interior, Bureau of Reclamation, Grand Coulee Third Powerplant Construction Office.

dc.contributor.authorRey, Samuel S.
dc.date.accessioned2019-07-25T18:08:42Z
dc.date.available2019-07-25T18:08:42Z
dc.date.issued1968-10-28
dc.description2 sheets 8.5 x 11 inch letterhead. Typed. Inscribed.en_US
dc.description.abstractReferred to enclosures are not in the collection.en_US
dc.identifier.otherRPB-099-16-012
dc.identifier.urihttp://hdl.handle.net/20.500.11867/17345
dc.publisherUNPUBLISHEDen_US
dc.titleTwo letters from the Department of the Interior, Bureau of Reclamation, Grand Coulee Third Powerplant Construction Office.en_US

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
RPB-099-16-012.pdf
Size:
268.3 KB
Format:
Adobe Portable Document Format
Description:
Correspondence