Costs of Construction, Operation and Maintenance for the Wapato, Ahtanum and Toppenish-Simcoe Irrigation Projects.
dc.contributor.author | United States Indian Irrigation Service | |
dc.date.accessioned | 2017-10-25T23:31:06Z | |
dc.date.available | 2017-10-25T23:31:06Z | |
dc.date.issued | 1955 | |
dc.description | Single 9 x 11 inch letterhead. Typed. ND. | en_US |
dc.description.abstract | "Twelve miles of drains were excavated, 467 metal headgates with measuring devices were installed." | en_US |
dc.identifier.other | REC-113-20-005 | |
dc.identifier.uri | http://hdl.handle.net/20.500.11867/1482 | |
dc.publisher | UNPUBLISHED | en_US |
dc.subject | Irrigation | en_US |
dc.title | Costs of Construction, Operation and Maintenance for the Wapato, Ahtanum and Toppenish-Simcoe Irrigation Projects. | en_US |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- REC-113-20-005.PDF
- Size:
- 367.26 KB
- Format:
- Adobe Portable Document Format
- Description:
- Correspodence