"Tuesday morning the dredger passed through the first of the many weirs along the canal. These weirs, which were made last fall and winter have cement foundations while the centers are constructed of framework which was for temporary use until the dredger worked to them. Then the frame work, which was built only wide enough to permit the huge machine to slide through would then be removed and after the machine passed would be completed entirely with cement work and for permanent use."